Reducing Delays During The Construction Lifecycle

The Summit Group is adept at identifying and reducing setbacks throughout the entire construction life cycle to provide our clients with the most efficient and cost-controlled delivery possible. Starting in preconstruction, our expertise and best practices allow us to assess potential risks throughout each phase of construction and inform all stakeholders with the critical information necessary to keep the project on time and on budget.

construction

Prevent Delays and Disruptions

At the inception of the project, it is essential to have a set plan for risk management in place. The Summit Group excels at establishing and maintaining an effective process and detailed procedures to identify risks and communicate these impacts to the entire construction delivery team (owners, architects, engineers, and contractors). This process is the essential baseline for preventing delays and disruptions, and our team of experts adjusts our level of frequency for reporting and the level of detail necessary based on your particular needs as the project progresses forward.

We offer the following services and tools to provide the most detailed risk analysis possible:

  • Risk Identification
  • Disaster Prevention & Relief Planning
  • Probability Assessments
  • Constructability Review
  • Multi-variable Regression Analysis
  • Sensitivity Analysis
  • Modeling Risk Profiles
  • International Risk Evaluations
  • Cost Escalation Analysis
  • Risk Monitoring
  • Schedule Forecasting
  • Cost Forecasting
  • Delays & Disruptions
  • Decision Risk Analysis
  • Damage Assessment